02 · Service
Outdoor
Kitchens
A grill on a concrete pad isn't a kitchen. We build the real thing — plumbed, wired, vented, and designed to last in salt air.
What’s included
Full outdoor kitchens — grill, burner, refrigeration, bar — with weather-rated cabinetry, gas and water rough-in, and venting that actually works under a cage.
✦Marine-grade cabinetry & stainless
✦Built-in gas grills, side burners & pizza ovens
✦Refrigeration, ice makers & kegerators
✦Bookmatched porcelain & stone bar tops
Scope of work
From permit
to punch list.
- 01Layout & appliance selection
- 02Gas, water & vent rough-in
- 03Cabinetry fabrication & install
- 04Countertop templating & install
- 05Hood venting under enclosures
- 06Tile, paver & final trim
Related work
In this practice.
Frequently asked
Good questions.
- Can you build an outdoor kitchen under an existing pool enclosure?
- Yes — most of what we build goes under a cage. We handle the venting, structural tie-ins, and any screen reframing required to integrate the kitchen cleanly.
- How long does an outdoor kitchen take to build?
- A typical outdoor kitchen runs 5–8 weeks from contract to final inspection, depending on appliance lead times and whether slab or paver work is included.
Thinking about a
outdoor kitchens?
Serving Tampa · St. Petersburg · Clearwater · Oldsmar · westbaybuilders.com